CyberMax
Home › Orbital compute tracker
SpaceX (with xAI) orbital data center and space AI compute projects (tracker)

SpaceX (with xAI) and orbital data centers

2 rows in the Orbitwren tracker: 2 as lead company. Verified 3 Oct 2026.

ProjectLeadHardwareTimelineStatusSources
Orbital data center constellation (FCC SAT-LOA-20260108-00016)SpaceX (with xAI)–FCC application filed 30 Jan 2026filed[1] [2]
Starmind AI1: first-generation AI compute satelliteSpaceX (with xAI)Space-optimized NVIDIA Vera Rubin NVL72 system (NVIDIA Rubin GPUs and Vera CPUs)Q4 2027 (Musk, 24 Aug 2026); 'significant scale' in 2028announced[1] [2] [3] [4] [5]

Orbital data center constellation (FCC SAT-LOA-20260108-00016)

SpaceX asked the FCC for up to one million satellites operating as orbital data centers; announced alongside SpaceX's acquisition of xAI. [1] [2]

Starmind AI1: first-generation AI compute satellite

SpaceX's first-generation orbital data center satellite. SpaceX said on 4 Aug 2026 it is partnering with NVIDIA on the AI1 compute payload; NVIDIA's 24 Aug 2026 release says AI1 will be based on an optimized Vera Rubin NVL72 rack-scale system. Musk gave Q4 2027 for the first launch to orbit. The wider constellation is the FCC filing tracked separately. [1] [2] [3] [4] [5]

Linked in the tracker with

NVIDIA, xAI

Independent tracker by CyberMax. Company and project names are used only to identify what is tracked; no affiliation with or endorsement by any company named. No third-party logos are used.